How much to build a Block of 4 Flats (2-bed each) in Lagos

A block of 4 two-bedroom flats — the classic Lagos rental investment property. Annual rental income of N4M-N12M depending on location. Payback period: 8-15 years.

2-bed~400 sqm12-18 months120M–₦180M (standard)

🧱 How much will it cost to build?

Pick a house type, finish level and location — see the cost breakdown by stage.

Block of 4 Flats (2-bed each) · Standard finish · Mainland
120.0M–₦180.0M
Mid-grade tiles, Dulux paint, stone-coated roofing options · 12-18 months build time
1,200
Cement (50kg bags)
15 tons
Iron rods
10,000
9-inch blocks
250 sqm
Roofing
Cost breakdown by stage
Foundation
15% of total
12.0M–₦27.0M
Superstructure
18% of total
14.4M–₦32.4M
Decking (2 floors)
14% of total
11.2M–₦25.2M
Roofing
8% of total
6.4M–₦14.4M
Finishing
35% of total
28.0M–₦63.0M
Electrical & Plumbing
10% of total
8.0M–₦18.0M

Stage-by-stage cost breakdown

Total estimate: 120,000,000–₦180,000,000

Foundation
15% of total
12.0M–₦27.0M
Superstructure
18% of total
14.4M–₦32.4M
Decking (2 floors)
14% of total
11.2M–₦25.2M
Roofing
8% of total
6.4M–₦14.4M
Finishing
35% of total
28.0M–₦63.0M
Electrical & Plumbing
10% of total
8.0M–₦18.0M

Labor rates for this build

All construction artisans you'll need for this project

RoleDaily rateMonthly rate
Bricklayer/Mason
Lays blocks, renders walls. The most critical artisan — bad bricklaying means uneven walls and structural issues. Experienced bricklayers charge premium.
5,000–₦10,000120,000–₦250,000
Carpenter
Roofing framework, formwork for concrete casting, doors/window frames. A good roofing carpenter prevents leaks for decades.
5,000–₦8,000100,000–₦200,000
Plumber
Water supply and drainage installation. First fix (before plastering) and second fix (after tiling). Poor plumbing causes the most expensive post-construction repairs.
4,000–₦8,00080,000–₦180,000
Electrician
Wiring, conduit installation, panel board, earthing. MUST be certified — unlicensed electricians cause house fires. First fix and second fix stages.
4,000–₦8,00080,000–₦180,000
Tiler
Floor and wall tile installation. Specialist tilers (marble, porcelain) charge N10K-N18K/day vs N5K-N8K for standard ceramic.
5,000–₦12,000100,000–₦250,000
Painter
Interior and exterior painting. Screeding, filling, undercoat, and finishing. A 3-bedroom needs 2-3 weeks of painting work.
4,000–₦7,00080,000–₦150,000
POP Installer
Plaster of Paris ceiling specialist. Paid per sqm (N3K-N6K/sqm installed) rather than daily rate. Cornices and decorative work cost extra.
5,000–₦10,000
Welder/Iron Bender
Bends and ties iron rods for reinforcement. Also fabricates gates, burglar-proof bars, and railings.
4,000–₦8,00080,000–₦160,000
Laborer (General)
Carries materials, mixes mortar, assists artisans. A site needs 3-6 laborers depending on project size.
3,000–₦5,00060,000–₦100,000
Site Engineer/Foreman
Supervises construction, reads drawings, manages artisans. A qualified site engineer prevents costly structural mistakes. 5-7% of project budget.
15,000–₦30,000350,000–₦600,000