LLagos.Cool โ€” Today

๐Ÿ–๏ธ Sand & Granite Prices in Lagos

Current Lagos prices for sand & granite โ€” brands, units, change percentage and where to buy. Updated 2026.

2 items trackedCheapest: Sharp Sand (per trip/tipper) (โ‚ฆ85,000)

Sand & Granite โ€” current prices

2 sand & granite items with retail prices, trends, and where to buy in Lagos

Sharp Sand (per trip/tipper)
per per trip
โ‚ฆ85,000โ€“150,000
+15.0%
๐Ÿ“ Direct from Ogun dredging sites ยท Lagos building material markets
Granite 3/4 inch (per trip)
per per trip (20 tons)
โ‚ฆ450,000โ€“600,000
+10.0%
๐Ÿ“ Abeokuta quarries (cheapest) ยท Lagos building markets

Related labor rates

Construction artisans you'll work with for sand & granite

RoleDaily rateMonthly rate
Bricklayer/Mason
Lays blocks, renders walls. The most critical artisan โ€” bad bricklaying means uneven walls and structural issues. Experienced bricklayers charge premium.
โ‚ฆ5,000โ€“โ‚ฆ10,000โ‚ฆ120,000โ€“โ‚ฆ250,000
Carpenter
Roofing framework, formwork for concrete casting, doors/window frames. A good roofing carpenter prevents leaks for decades.
โ‚ฆ5,000โ€“โ‚ฆ8,000โ‚ฆ100,000โ€“โ‚ฆ200,000
Plumber
Water supply and drainage installation. First fix (before plastering) and second fix (after tiling). Poor plumbing causes the most expensive post-construction repairs.
โ‚ฆ4,000โ€“โ‚ฆ8,000โ‚ฆ80,000โ€“โ‚ฆ180,000
Electrician
Wiring, conduit installation, panel board, earthing. MUST be certified โ€” unlicensed electricians cause house fires. First fix and second fix stages.
โ‚ฆ4,000โ€“โ‚ฆ8,000โ‚ฆ80,000โ€“โ‚ฆ180,000
Tiler
Floor and wall tile installation. Specialist tilers (marble, porcelain) charge N10K-N18K/day vs N5K-N8K for standard ceramic.
โ‚ฆ5,000โ€“โ‚ฆ12,000โ‚ฆ100,000โ€“โ‚ฆ250,000
Painter
Interior and exterior painting. Screeding, filling, undercoat, and finishing. A 3-bedroom needs 2-3 weeks of painting work.
โ‚ฆ4,000โ€“โ‚ฆ7,000โ‚ฆ80,000โ€“โ‚ฆ150,000
POP Installer
Plaster of Paris ceiling specialist. Paid per sqm (N3K-N6K/sqm installed) rather than daily rate. Cornices and decorative work cost extra.
โ‚ฆ5,000โ€“โ‚ฆ10,000โ€”
Welder/Iron Bender
Bends and ties iron rods for reinforcement. Also fabricates gates, burglar-proof bars, and railings.
โ‚ฆ4,000โ€“โ‚ฆ8,000โ‚ฆ80,000โ€“โ‚ฆ160,000
Laborer (General)
Carries materials, mixes mortar, assists artisans. A site needs 3-6 laborers depending on project size.
โ‚ฆ3,000โ€“โ‚ฆ5,000โ‚ฆ60,000โ€“โ‚ฆ100,000
Site Engineer/Foreman
Supervises construction, reads drawings, manages artisans. A qualified site engineer prevents costly structural mistakes. 5-7% of project budget.
โ‚ฆ15,000โ€“โ‚ฆ30,000โ‚ฆ350,000โ€“โ‚ฆ600,000