EV · MONTHLYas of 2026-07-28
EV Charging Station for Lagos — Where, How Much, When
22 station · 4 network · 2 solar-backed · 2 DC Fast
The Lagos public EV charging network don grow from 4 station for 2022 reach 22 now — most concentrate for Island and high-traffic Mainland mall. The split na obvious: AC Level 2 (slow) na cheap and dey everywhere; DC Fast (50-150kW) cost more but e dey give 20-45 minute charge. Almost every Lagos EV owner dey charge for house mostly and use public station for top-up.
BY NETWORK4 operators
16
MAX
16 station
4
Qoray Mobility
4 station
1
SAGLEV
1 station
1
University of Lagos / NADDC
1 station
BY ZONE
ISLAND
8station
VI, Lekki Phase 1, Ikoyi, Oniru, Ajah. Concentrate for premium retail and hotel.
MAINLAND
14station
Ikeja, Maryland, Yaba, Surulere. Mostly mall and shopping centre.
ALL STATIONS22 sites
| Site | Network | Area | Type | kW | ₦/kWh | Hours | Solar |
|---|---|---|---|---|---|---|---|
| Qoray Marina | Qoray Mobility | Lagos Island | AC Level 2 | 22 | ₦300 | 8AM-8PM | |
| Qoray Sheraton Ikeja | Qoray Mobility | Ikeja | DC Fast | 60 | ₦500 | 24/7 | |
| Qoray Victoria Island | Qoray Mobility | Victoria Island | AC Level 2 | 22 | ₦300 | 8AM-10PM | |
| Qoray Marriott Ikeja | Qoray Mobility | Ikeja GRA | DC Fast | 60 | ₦500 | 24/7 | |
| MAX Lekki Phase 1 | MAX | Lekki Phase 1 | AC Level 2 | 22 | ₦250 | 7AM-9PM | |
| MAX Lekki 2 | MAX | Lekki Phase 1 | AC Level 2 | 22 | ₦250 | 7AM-9PM | |
| MAX Ikota | MAX | Ajah | AC Level 2 | 7 | ₦200 | 8AM-7PM | |
| MAX Ikoyi NNPC | MAX | Ikoyi | AC Level 2 | 22 | ₦250 | 24/7 | |
| MAX Ajah | MAX | Ajah | AC Level 2 | 7 | ₦200 | 8AM-8PM | |
| MAX Ikeja Computer Village | MAX | Ikeja | AC Level 2 | 22 | ₦250 | 8AM-8PM | |
| MAX Ikeja NNPC Oregun | MAX | Ikeja | AC Level 2 | 22 | ₦250 | 24/7 | |
| MAX Ikeja Airport Road | MAX | Ikeja | AC Level 2 | 22 | ₦250 | 8AM-8PM | |
| MAX Ogba | MAX | Ogba | AC Level 2 | 7 | ₦200 | 9AM-8PM | |
| MAX UNILAG | MAX | Yaba | AC Level 2 | 7 | ₦180 | 8AM-6PM | ☀ |
| MAX Yaba Sabo | MAX | Yaba | AC Level 2 | 7 | ₦200 | 8AM-8PM | |
| MAX Yaba NNPC | MAX | Yaba | AC Level 2 | 22 | ₦250 | 24/7 | |
| MAX Surulere | MAX | Surulere | AC Level 2 | 7 | ₦200 | 8AM-7PM | |
| MAX Ago Palace | MAX | Egbe | AC Level 2 | 7 | ₦200 | 8AM-7PM | |
| MAX Egbeda | MAX | Alimosho | AC Level 2 | 7 | ₦200 | 8AM-7PM | |
| MAX Alapere NNPC | MAX | Ogudu | AC Level 2 | 7 | ₦200 | 24/7 | |
| SAGLEV Mega Plaza | SAGLEV | Victoria Island | AC Level 2 | 22 | ₦300 | 9AM-9PM | |
| UNILAG Solar Station | University of Lagos / NADDC | Yaba | AC Level 2 | 7 | ₦180 | 8AM-5PM | ☀ |
RELATED
COST CHECK
EV vs petrol — ₦145K savings monthly
Per kWh charging cost na nothing pass petrol. See full math.
HOME CHARGING
Home solar + EV = ₦11K/month transport
Solar at home dey crush public charging cost.
QUESTIONS WEY DEY ASK
Charging question
AC Level 2 (slow) charging dey ₦70-₦95/kWh for most network. DC Fast (50-150kW) dey ₦120-₦180/kWh — e higher because the network dey amortise grid+inverter+battery infrastructure. Full charge for 60kWh battery cost ₦4,200-₦5,700 (Level 2) or ₦7,200-₦10,800 (DC Fast).
AC Level 2 at 7-22kW: 3-8 hours for full charge on typical EV battery. DC Fast at 50-150kW: 20-45 minutes to reach 80%. Most Lagos network dey throttle below 50kW for thermal protection, so real-world DC session average 30 minutes.
The main network: Possible EV (biggest Island footprint, Lekki/VI/Ikoyi), Stallion EV (mall-based site), Beacon Power (mainland focus), Soccket Charge (apartment-block partnership). Most charge station na owned by the network — no inter-network roaming yet, so you fit need 2-3 different app.
Yes — and most Lagos EV owner dey charge for house. Home wallbox (7kW AC Level 2) cost ₦400K-₦800K to install and dey add 25-35km range per hour. For overnight charging, that na more than enough. Public charging for Lagos na for top-up or long trip, no be daily fuel.
Most network-operated station dey open 8am-10pm. Mall and supermarket charging point dey follow the host venue hour. The 24/7 station na usually for hotel (Lagos Continental, Eko Hotel, Radisson Blu) where EV dey park as part of longer stay.