How much does it cost to build a 3-bedroom bungalow in Lagos?

The most-searched construction question in Nigeria. Full breakdown — foundation, blockwork, roofing, finishing, plus the materials list and labor cost.

Budget: ₦25M–₦35MStandard: ₦35M–₦50MLuxury: ₦50M–₦80M

🧱 How much will it cost to build?

Pick a house type, finish level and location — see the cost breakdown by stage.

3-Bedroom Bungalow · Standard finish · Mainland
35.0M–₦50.0M
Mid-grade tiles, Dulux paint, stone-coated roofing options · 5-8 months build time
350
Cement (50kg bags)
3.5 tons
Iron rods
3,000
9-inch blocks
160 sqm
Roofing
Cost breakdown by stage
Foundation & Substructure
20% of total
5.0M–₦10.0M
Block Work & Superstructure
22% of total
5.5M–₦11.0M
Roofing
12% of total
3.0M–₦6.0M
Plastering & First Fix
10% of total
2.5M–₦5.0M
Finishing (tiles, paint, doors, windows)
28% of total
7.0M–₦14.0M
Electrical & Plumbing
8% of total
2.0M–₦4.0M

Stage-by-stage cost breakdown

Total estimate: 35,000,000–₦50,000,000

Foundation & Substructure
20% of total
5.0M–₦10.0M
Block Work & Superstructure
22% of total
5.5M–₦11.0M
Roofing
12% of total
3.0M–₦6.0M
Plastering & First Fix
10% of total
2.5M–₦5.0M
Finishing (tiles, paint, doors, windows)
28% of total
7.0M–₦14.0M
Electrical & Plumbing
8% of total
2.0M–₦4.0M

Lagos Construction Labor Rates

Daily and monthly rates for construction artisans in Lagos

RoleDaily rateMonthly rate
Bricklayer/Mason
Lays blocks, renders walls. The most critical artisan — bad bricklaying means uneven walls and structural issues. Experienced bricklayers charge premium.
5,000–₦10,000120,000–₦250,000
Carpenter
Roofing framework, formwork for concrete casting, doors/window frames. A good roofing carpenter prevents leaks for decades.
5,000–₦8,000100,000–₦200,000
Plumber
Water supply and drainage installation. First fix (before plastering) and second fix (after tiling). Poor plumbing causes the most expensive post-construction repairs.
4,000–₦8,00080,000–₦180,000
Electrician
Wiring, conduit installation, panel board, earthing. MUST be certified — unlicensed electricians cause house fires. First fix and second fix stages.
4,000–₦8,00080,000–₦180,000
Tiler
Floor and wall tile installation. Specialist tilers (marble, porcelain) charge N10K-N18K/day vs N5K-N8K for standard ceramic.
5,000–₦12,000100,000–₦250,000
Painter
Interior and exterior painting. Screeding, filling, undercoat, and finishing. A 3-bedroom needs 2-3 weeks of painting work.
4,000–₦7,00080,000–₦150,000
POP Installer
Plaster of Paris ceiling specialist. Paid per sqm (N3K-N6K/sqm installed) rather than daily rate. Cornices and decorative work cost extra.
5,000–₦10,000
Welder/Iron Bender
Bends and ties iron rods for reinforcement. Also fabricates gates, burglar-proof bars, and railings.
4,000–₦8,00080,000–₦160,000
Laborer (General)
Carries materials, mixes mortar, assists artisans. A site needs 3-6 laborers depending on project size.
3,000–₦5,00060,000–₦100,000
Site Engineer/Foreman
Supervises construction, reads drawings, manages artisans. A qualified site engineer prevents costly structural mistakes. 5-7% of project budget.
15,000–₦30,000350,000–₦600,000

📝 The Lagos context

"How much does it cost to build a three-bedroom house in Lagos?" is probably the most-asked construction question in Nigeria, and the honest answer is a range, not a single number — because the total depends on decisions you make, not just on the design. The three-bedroom bungalow is the benchmark because it is the most common family build, but even for that one layout, basic, standard and luxury finishes produce very different final figures.

Break the cost into stages and it becomes controllable rather than mysterious: land (often the biggest and most variable line, and usually quoted separately), foundation, blockwork to lintel and roof level, roofing, then finishing — plastering, tiling, kitchen, doors, POP, painting, plumbing and electrical. The shell (structure and roof) is fairly predictable and tracks material prices — cement, rods, blocks, roofing — while finishing is where your taste and budget swing the total by the widest margin.

The reason the figure moves so much over time is that it is built almost entirely from volatile materials. Cement, steel and sand-and-granite all shift with fuel, the naira and the season, so a build costed last year rarely costs the same today. The practical defence is the same one experienced builders use: estimate quantities early, buy structural materials in bulk during a softer price window, supervise the structure for quality, and decide your finishing level up front — because that single choice, more than any other, decides where your final number lands.