How much to build a 5-Bedroom Duplex in Lagos

Large family duplex — the aspirational Lagos home. BQ (Boys' Quarters) often included. Commonly found in GRA estates, Lekki Phase 1, Banana Island.

5-bed~320 sqm10-18 months120M–₦200M (standard)

🧱 How much will it cost to build?

Pick a house type, finish level and location — see the cost breakdown by stage.

5-Bedroom Duplex · Standard finish · Mainland
120.0M–₦200.0M
Mid-grade tiles, Dulux paint, stone-coated roofing options · 10-18 months build time
800
Cement (50kg bags)
12 tons
Iron rods
7,000
9-inch blocks
280 sqm
Roofing
Cost breakdown by stage
Foundation
15% of total
12.0M–₦30.0M
Superstructure
18% of total
14.4M–₦36.0M
Decking
12% of total
9.6M–₦24.0M
Roofing
10% of total
8.0M–₦20.0M
Plastering & First Fix
10% of total
8.0M–₦20.0M
Finishing
28% of total
22.4M–₦56.0M
Electrical & Plumbing & Ext
7% of total
5.6M–₦14.0M

Stage-by-stage cost breakdown

Total estimate: 120,000,000–₦200,000,000

Foundation
15% of total
12.0M–₦30.0M
Superstructure
18% of total
14.4M–₦36.0M
Decking
12% of total
9.6M–₦24.0M
Roofing
10% of total
8.0M–₦20.0M
Plastering & First Fix
10% of total
8.0M–₦20.0M
Finishing
28% of total
22.4M–₦56.0M
Electrical & Plumbing & Ext
7% of total
5.6M–₦14.0M

Labor rates for this build

All construction artisans you'll need for this project

RoleDaily rateMonthly rate
Bricklayer/Mason
Lays blocks, renders walls. The most critical artisan — bad bricklaying means uneven walls and structural issues. Experienced bricklayers charge premium.
5,000–₦10,000120,000–₦250,000
Carpenter
Roofing framework, formwork for concrete casting, doors/window frames. A good roofing carpenter prevents leaks for decades.
5,000–₦8,000100,000–₦200,000
Plumber
Water supply and drainage installation. First fix (before plastering) and second fix (after tiling). Poor plumbing causes the most expensive post-construction repairs.
4,000–₦8,00080,000–₦180,000
Electrician
Wiring, conduit installation, panel board, earthing. MUST be certified — unlicensed electricians cause house fires. First fix and second fix stages.
4,000–₦8,00080,000–₦180,000
Tiler
Floor and wall tile installation. Specialist tilers (marble, porcelain) charge N10K-N18K/day vs N5K-N8K for standard ceramic.
5,000–₦12,000100,000–₦250,000
Painter
Interior and exterior painting. Screeding, filling, undercoat, and finishing. A 3-bedroom needs 2-3 weeks of painting work.
4,000–₦7,00080,000–₦150,000
POP Installer
Plaster of Paris ceiling specialist. Paid per sqm (N3K-N6K/sqm installed) rather than daily rate. Cornices and decorative work cost extra.
5,000–₦10,000
Welder/Iron Bender
Bends and ties iron rods for reinforcement. Also fabricates gates, burglar-proof bars, and railings.
4,000–₦8,00080,000–₦160,000
Laborer (General)
Carries materials, mixes mortar, assists artisans. A site needs 3-6 laborers depending on project size.
3,000–₦5,00060,000–₦100,000
Site Engineer/Foreman
Supervises construction, reads drawings, manages artisans. A qualified site engineer prevents costly structural mistakes. 5-7% of project budget.
15,000–₦30,000350,000–₦600,000

📝 The Lagos context

A five-bedroom duplex is the premium end of the private-home market in Lagos — a two-storey house, usually with an ensuite master, several other bedrooms, generous living and dining space, and often a BQ, sited on the estates of Lekki, Ikoyi, Ikeja GRA and the newer developments. As a storey building it carries costs a bungalow does not: a suspended floor slab, a staircase, more structural steel and a bigger roof, all of which push both the material bill and the engineering up.

Finish level is where the range really opens. At standard finish a five-bed duplex is already a substantial build; at luxury finish — imported tiles, fitted kitchens, smart-home wiring, quality joinery, elaborate POP and premium sanitaryware — the finishing can rival the cost of the structure itself. Material prices set the shell, but at this size and specification the finishing and the services (plumbing, electrical, sometimes a lift or generator house) are large lines in their own right. Land, excluded here, is typically premium too.

For a build of this scale, professional input pays for itself. A proper structural design, a competent builder and close cost control matter far more than they do on a bungalow, because the sums are larger and the mistakes more expensive. Bulk-buying structural materials still helps, but the bigger levers are a sound design, a disciplined finishing specification, and supervision that keeps a long, complex project on budget from foundation to handover.